Home >

System Engineering Contract

2011/1/6 11:33:00 43

System Engineering Contract

Party A: telephone, telephone, telephone, telephone, telephone, telephone, telephone, telephone, telephone, telephone, telephone, telephone and telephone:


Party B: telephone, telephone, telephone, telephone, telephone, telephone, telephone, telephone, telephone, telephone, telephone, telephone and telephone:


A friendly negotiation between the two sides has made it possible.

engineering

The following agreements are reached:


1. Party A shall provide Party B with equipment and software for the company.


Total contract price: $, $, $, $, $, and $$


  

among

Software fee: $1 million yuan (capital): capital and trade.


The cost of hardware is RMB.


Project fee.


Two

payment

mode


Party B pays first party's total project advance payment.

A total of $1 million yuan.


Among them, the software fee is $.


The cost of hardware is RMB.


Project cost: $.


After Party A's computer hardware is delivered to Party B's designated place, after Party B points, Party B shall pay all hardware costs to Party A.


After the installation is completed, Party B will pay the remaining sum to Party A within seven days.


All payment methods are cash payment.


3. party a responsibility


(1) Party A completes the software installation and commissioning before the time required by Party B.


(2) the system administrator who is responsible for training party B and the maintenance period of the software are free of charge. The maintenance site is located at the location of party a company.

Within one year, the software provided by Party A was damaged due to the failure of hardware supplied by Party A.


(3) Party A can collect the cost of the expansion part if the functions are extended according to the requirements of Party B.


(4) one year later, Party A will pay the maintenance of the equipment and software for maintenance. The maintenance cost will be RMB yuan / yuan (excluding the cost of replacing equipment and increasing the number of software support points).


4. Party B's responsibility


(1) the material used in the commissioning system of the Party A is only for system testing, and shall not be used for KTV business or any other commercial activities for profit. Otherwise, all civil and criminal liabilities involved shall be borne by Party B.


(2) Party B shall not be responsible for the activities required by Party B for business or other business activities for profit.


(3) Party B shall be responsible for Party A's expenses arising from the damage caused by the system and the need for Party A's on-site service.


5. other matters


(1) software should not be copied; software rights should not be removed, covered or applied.


(2) in accordance with the second provision of this contract, if Party B fails to pay more than the time limit, Party A shall have the right to terminate the contract, and Party A shall not be responsible for the consequences arising therefrom.


6. liability for breach of contract


If both parties fail to do so, they shall be resolved by mutual consultation. If a party breaches or infringements, refer to the relevant laws and regulations of China. If there is any dispute between the two parties, submit it to the people's court for judgment.


7. the contract shall come into force after signature and seal of the representatives of both parties. The original contract is made in duplicate. Each party holds one copy and has the same legal effect.

Statement: this contract is invalid after photocopying or alteration.


Party A: (seal)


Person in charge: Mr. Yu, he is in charge.


The time is: the first, the second and the third.


Location: the first, the second and the third.


Party B: (seal)


Person in charge: Mr. Yu, he is in charge.


The time is: the first, the second and the third.


  地点:_______________
  • Related reading

Contract For Feasibility Study Of Construction Projects

Contract template
|
2011/1/6 11:31:00
42

Integrated Kitchen Production Contract

Contract template
|
2011/1/6 11:29:00
57

Repair And Repair Contract

Contract template
|
2011/1/6 11:26:00
35

Criminal Principal Agent Contract

Contract template
|
2011/1/5 13:52:00
84

Exclusive Agency Contract Agreement

Contract template
|
2011/1/5 13:50:00
103
Read the next article

中外来件装配合同

为了保证双方履行合同和及时按合同规定支付罚款或赔偿损失,双方应分别向对方提供各自银行所出具的保函。